
Add to Cart
Galvanised Steel C Profiled Purline Cold Rollformer Machine With Cr12 Mould Steel Rollers and Hydraulic Cutter
Introduction
This Cee profile purlin cold roll forming machine adopts Cr12 mould steel for the rollers and cutting blades to make galvanized steel C profiled purlines with a perfect quality. The suitable steel sheet thickness can be 1.0-2.0mm or 2.0mm-3.0mm, which decides the rollers design and machine cost.
Technical Specifications of Steel C Section Purlin Roll Forming Line
Uncoiler (manual/automatic) | Holding Capacity | 3 tons |
Inner Diameter | 508mm | |
Outside Diameter | 1200mm | |
Coil width | Max. 600mm | |
Feeding and straightening device | Pinch rollers | two sets |
Straightening rollers | three up, four down | |
Diameter of rollers | 75mm | |
Metal Roll Former | Frame type | steel wall plates |
Forming Roller stand | about 14 Groups | |
Shaft material | First grade 45# steel, | |
Shaft diameter | 75mm | |
Roller material | Cr12 with quenching treatment | |
Motor driving Type | chains transmission | |
Main Motor | 15KW | |
Size changing method | regulation of spacers manually | |
Punching Device | Type | Hydraulic |
Material | Cr12 mould steel | |
Holes distance | Adjustable | |
Hydraulic cutter | Type | Post-cutting |
Material of mould | Cr12 mould steel | |
Cutting tolerance | ± 2mm | |
PLC control cabinet | PLC | Mitsubishi from Japan |
Length Meaturing | Omron Encoder | |
Touching Screen | Mitsubishi from Japan | |
Transducer | Mitsubishi | |
Hydraulic station | Power | 7.5 KW |
Hydraulic pressure | 11 Mpa | |
Runout Table | Non-power type or auto stacker | Optional |
Working Flow of Steel C Section Purlin Roll Forming Line
Decoiling----Guilding----Leveling----Rollforming----Punching Holes----Cutting----C purlins on tables
Installation and training
1. The buyer can send workers or technicians to our factory to accept training for free.
2. We can send detailed operation manual and video to the buyer to do the installation and commission
3. If the buyer need our technicians to assist on the installation and commission in his workshop, we can send one or two of our technicans to do that and the buyer is required to afford the round flight tickets, supply hotel, food and pay USD100/day to our technicians.
After Service
1. One year's guarantee
2. Feedback for technical support within 24 hours
3. Spare parts all the time and delivered to customers within 7 working days
Machine Picture: